Full Rebuild - Part 3 - Making progress

It was definitely time for a new timing chain. Here's the old one with quite a bit of slack, and the TDC marks don't quite line up.
The new one is nice and tight, and we got the TDC marks to line up exactly.
The harmonic balancer was starting to fall apart, so it was past time for this upgrade as well. It was a bit cheaper on RockAuto than we had seen elsewhere, so this was added to the list.


 We did a new oil pump while we were in there. The old one seemed fine, but it's hard to know what condition the internal parts and bearings are in.
Here's the gasket kit. There were a few items missing, and a few wrong items in here. It took a bit of doing, but we eventually got everything we needed.
 A bit overwhelming, we lost control of the garage at this point and took over both bays.

Funny thing, you need to take the bumper off to get the cam shaft out. That was unexpected on my part, but Connor somehow knew it was coming!

 We gave the engine a nice coat of epoxy high-temp black.


Valve guides are a royal pain in the rear. I banged around and hacked at a few things, and even broke one before I found a system that worked. We picked up a cheap $20 air hammer which really made things easier, but that was after we had already broken an insert and had to wait days for new ones to arrive.
 So the big trick here was to drill out a cheap socket, and slide it over a new valve insert and use this to drive out the old insert.

 Here are the crank bearings
This took a bit of searching, and doing it wrong, and destroying a bearing before we got good at it. One nice hack. Tie a knot in a piece of mason line, and put it in the oil channel of the crank shaft. Then spin the crank around to push the bearing out. We then reversed the process using a cotter pin to "push" the new bearing in most of the way.
Here we are with some major progress, Cylinders are honed, piston rings are replaced, pistons cleaned up, and everything in place.




 Lifters are the last piece before we get ready to put the head gasket back on, and mount the head.



Wednesday, September 13, 2017

Full Rebuild - Part 2 - Pistons Bearings, and Lifters

We kept at the tear down, needing to know things like the crank bearing sizes, and if we were going keep or replace the pistons.





Here are the hydraulic lifters, these contact the cam shaft and push the pushrods to open and close the valves. 

 We had at least 1 broken ring in cylinder 6, and possibly in cylinder 4. There was clear evidence in cylinder 6, since the piston walls were fouled a bit further down from the top than the others. 4 may have broken while removing it.
At this point we had all the required measurements, and were ready to order parts and begin the wait for boxes to arrive.

Sunday, September 10, 2017

Full Rebuild - Part 1 Getting Started

So this has been "Rebuild66.blogspot.org" and all this time no actual rebuild? Well, to be fair we've done pieces of it getting the car on the road. All that is about to change.....

So, the progressive oil leak of the Mustang got to the point where there was a solid trail out of the garage one night in September. It was time to do another set of gaskets, and a rear main seal, and while we were at it, we ended up doing a full rebuild of the engine.

Shopping RockAuto, we quickly found a whole list of supplies that were needed, and that crank bearings, and headgaskets (ours was seeping out the sides a little) valve seals and a whole list of stuff would get us all the parts needed to get started.

The main problem was we needed to do the tear down, before we could order the parts because we did not know exactly what was in the engine.



 Here we are with the head off.

 And here's one of the critical pieces of information. Our cylinders are overbored at 0.040. Very Nice!
 Purchased a set of calipers, cheap. Now I use them for everything. It's one of those tools you can live without until you have a set. Then you need them for everything.

 Getting dimensions of the valves